Export Bridge
出口通道

可再生能源

Panels, structures and components with a project file and a grid that can take them.

Export Bridge
可再生能源

Renewables leave this desk as a project, not as a pallet photo. The corridor needs certificates, plant and the market that will connect the kit.

What the desk opens

  • Range, plant and project references
  • Certificates the destination will bank
  • Packing, volume and the first site
  • Finance and logistics on the same project

The buyer sees a prepared file. The producer is not sent to an open auction.

联系我们

联系我们,探索全球贸易方案

我们的专家随时解答问题并帮您找到合适伙伴。

  • 获取专家指导
  • 量身定制方案
  • 快速支持服务